Heat exchange investigation and modernization of furnace of P-67 boiler of 800 MW unit
V.V. Bely1, S.V. Porozov1, V.V. Vasiliev2, A.A. Dekterev3, and E.S. Tepfer4
1Berezovskaya Power Plant-1, Sharypovo, Russia
Pages: 287–299
Abstract
For the purpose of the development and introduction of the arrangements aimed at increasing the slagless power, economy, and reliability of the P-67 boiler of the 800 MW unit of the Berezovskaya Power Plant No. 1, the variation of heat-engineering characteristics of the coal (lignite) of the open-cast mine
|