Publishing House SB RAS:

Publishing House SB RAS:

Address of the Publishing House SB RAS:
Morskoy pr. 2, 630090 Novosibirsk, Russia



Advanced Search

Fundamental and applied issues of mining

2019 year, number 2

FORECASTING THE STABILITY OF CAPITAL AND PREPARATORY WORKINGS WHEN CREATING FLOW DIAGRAMS

V.F. Demin1, N.A. Nemova2
1Karaganda state technical university, Karaganda, Republic of Kazakhstan
2Chinakal Institute of Mining, Siberian Branch, Russian Academy of Science, Novosibirsk, Russia
Keywords: Поддержание выемочных выработок, устойчивости горных выработок, геомеханика, технология упрочнения приконтурного массива, анкерование, Maintenance of excavation workings, stability of mine workings, geomechanics, peripheral massif strenghtening technology, anchoring

Abstract

To assess the stability of mine workings, the mechanism of deformation, displacement and collapse of rocks in a structurally disturbed heterogeneous massif is investigated. Technological conditions are developed for stabilizing the soil of working, taking into account the state of the rock mass. The parameters of roof bolting ensuring the safety and efficiency of mine operations are obtained.