Publishing House SB RAS:

Publishing House SB RAS:

Address of the Publishing House SB RAS:
Morskoy pr. 2, 630090 Novosibirsk, Russia



Advanced Search

Journal of Applied Mechanics and Technical Physics

2019 year, number 1

Analytical Solution for the External Stress Acting on the Lining in a Deep-Buried Circular TBM Tunnel Considering the Seepage Field

Q. Yan1, C. Zhang1,2, W. Wu1, Y. Zhang1, T. Ma3
1Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, 610031, Chengdu, China
2Smart Material and Structure Laboratory, Department of Mechanical Engineering, University of Houston, Houston, TX 77204, USA
3China Railway Eryuan Engineering Group Co. Ltd, 610031, Chengdu, China
Keywords: облицовка туннеля, горнопроходческая машина, подземные воды, контролируемый дренаж, внешняя нагрузка, фильтрационные силы, упругое решение, TBM tunnel lining, groundwater, controlled drainage, external loading, seepage force, elastic solution

Abstract

Based on the elastic theory and the seepage flow theory, a new analytical solution with consideration of the seepage force is proposed to determine the external stress on the lining of a circular TBM tunnel. According to this solution, the relationships between the permeability coefficient of rock masses and the maximum allowable drainage flow are studied. The influence of the controlled drainage flow and the elastic modulus of surrounding rocks on the external stress is discussed. Moreover, in order to validate the results obtained from the elastic analytical solution developed in this paper, a comparison between the results obtained from the solution considering the seepage force and that without consideration of the seepage force is performed.