Publishing House SB RAS:

Publishing House SB RAS:

Address of the Publishing House SB RAS:
Morskoy pr. 2, 630090 Novosibirsk, Russia



Advanced Search

Region: Economics and Sociology

2017 year, number 2

Estimation of the Public Efficiency of the Infrastructure Project on the Example of the Second Branch ofthe Eastern Siberia - Pacific Ocean Oil Pipeline

O.I. GULAKOVA1, YU.S. ERSHOV1, N.M. IBRAGINIOV1,2, T.S. NOVIKOVA1,2
1Institute of Economics and Industrial Engineering, Siberian Branch of the Russian Academy of Sciences, Ac. Lavrentiev av., 17, Novosibirsk, 630090, Russia
2Novosibirsk National Research State University, Pirogov st., 1, Novosibirsk, 630090, Russia
Keywords: инфраструктурный проект, прямые и косвенные эффекты, межрегиональная межотраслевая модель, коммерческая и общественная эффективность, infrastructure project, direct and indirect effects, interregional input-output model, commercial and public efficiency

Abstract

The article presents the results of research on the development and application of methodological tools for an integrated assessment of the impact that a large-scale infrastructure project has on the development of the regional and national economy. The methodological framework of this study is a combination of two major areas of analysis and evaluation of project efficiency: project analysis techniques and methodological approaches to studying the economy in view of spatial and cross-sectoral aspects while using an interregional input-output optimization model (OMMM). When assembled, these areas provide an estimate of indirect project efficiency, as well as obtain results in terms of the main macroeconomic indicators at the national and macro-regional levels. We present the results of calculations carried out for the first time on a real project with reliable information in the framework of suggested approach to estimate the public efficiency of infrastructure projects. The article introduces a comprehensive assessment of the impact of ESPO-2 on the economy of Russia and the Far Eastern Federal District with regard to redistri-butive and indirect effects resulting from the project.