Publishing House SB RAS:

Publishing House SB RAS:

Address of the Publishing House SB RAS:
Morskoy pr. 2, 630090 Novosibirsk, Russia



Advanced Search

Chemistry for Sustainable Development

2016 year, number 3

Production of Alternative Pitch from Coal

P. N. KUZNETSOV1, E. N. MARAKUSHINA2,3, F. A. BURYUKIN3, Z. R. ISMAGILOV4,5
1Institute of Chemistry and Chemical Technology, Siberian Branch of the Russian Academy of Sciences, Akademgorodok 50, Build. 24, Krasnoyarsk 660036
2UC RUSAL ITTs Ltd., Ul. Pogranichnikov 37, Build. 1, Krasnoyarsk 660111
3Institute of Petroleum and Gas, Siberian Federal University, Prospekt Svobodny 82, Build. 6, Krasnoyarsk 660041
4Institute of Coal Chemistry and Material Science, Federal Research Centre of Coal and Coal Chemistry, Siberian Branch of the Russian Academy of Sciences, Sovetskiy Pr.18, Kemerovo 650000
5Boreskov Institute of Catalysis, Siberian Branch of the Russian Academy of Sciences, Pr. Akademika Lavrentyeva 5, Novosibirsk 630090
Keywords: каменноугольный пек, заменители, терморастворение угля, анод, coal-tar pitch, substitutes, thermal dissolution of coal, anode

Abstract

Review of the state of the problem connected with the preparation of substitutes for coal-tar pitch for the production high-quality carbon materials is presented. The possibilities of alternative methods of their preparation from petroleum raw material and the products of thermal and thermochemical coal processing are considered. The promising significance of the low-temperature process of coal thermal dissolution under soft conditions for obtaining extractive pitch is demonstrated. A comparison of the chemical composition and technical parameters of the obtained extractive pitch with the industrial coal-tar pitch and petroleum-based pitch is carried out. The obtained extractive pitch is close in composition, molecular structure and technical parameters to coal-tar pitch and petroleum-coal tar pitch. Using extractive pitch as a binder, an experimental sample of anode was manufactured. Its correspondence to the major technical requirements was demonstrated.