TECHNICAL ASSESSMENT AND IMPLEMENTATION OF CEMENTED ROCK FILL AT THE CERRO LINDO MINING UNIT IN PERU
L. A. Perez1, C. G. Perea2
1INCIMMET S.A. Development of New Services for the Excavation Solutions Area, Lima, Peru 2Group of Environmental Geochemistry, Pedagogical and Technological University of Colombia, Sogamoso, Colombia
Keywords: Sublevel stoping, cemented rock fill, backfill system, backfill strength, underground mining
Abstract
The authors developed a pilot project to test different preparations of cemented rock fill, determine the appropriate mix design, and check necessary mix strength. The article presents the required resistance studies and the research method used to determine feasibility, cost performance and increased mine productivity and safety. The study achieved a resistance peak of 1.6 MPa, reduced dilution of the ore, and increased pillar stability.
|