JUSTIFICATION OF OPTIMAL PARAMETERS FOR MINING SYSTEM OF THE IROKINDINSKY GOLD DEPOSIT
A. V. Aykin1, R. V. Shikhametov2, D. F. Zayatdinov3, E. D. Pryanichnikov2
1LLC Scientific and Production Association "Alzamir", Kemerovo, Russia 2LLC "Irokinda", Irokinda, Republic of Buryatia, Russia 3Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk, Russia
Keywords: Gold mining, mining system, 3D modeling, mining operations, ore vein
Abstract
A practical solution for selecting the optimal mining system for Serebryakovskaya vein of the Irokindinsky deposit is presented. The geological and engineering conditions for mining the deposit were analyzed and the areas with complex conditions where specification of physical and mechanical rock properties is required were identified. Analytical calculations of main mining parameters were performed using numerical 3D modeling in the software package Map3D.
|