Optimizing Cupriferous Ore Output at Oktyabrsky Copper-Nickel Deposit, Considering Lag Factor
A. A. ORDIN1, I. V. VASIL'EV2
1Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Krasnyi pr. 54, Novosibirsk, 630091 Russia 2SibgiproZoloto, Krasnyi pr. 1, Novosibirsk, 630007 Russia
Keywords: лаговое моделирование, интегральные критерии оптимальности, максимум, оптимизация, проектная мощность, инвестиции, рудник, камерная система разработки, gently dipping deposits, mining with direct dumping, parameters, process flowsheets, dragline, overburdent rocks, area of application
Abstract
Under discussion are the direct dumping flowsheets applied to remove lower overburden layers at coal series deposits in Kuzbass. The authors present the calculation procedure for the parameters of overburden excavation and re-excavation flowsheets using draglines. It is found how the re-excavation coefficient depends on the place and level of the dragline site. The recommendations on selecting the dragline route in case of internal dumping are made. The main trends toward expanding the area of application of the direct dumping technology are identified.
|