Publishing House SB RAS:

Publishing House SB RAS:

Address of the Publishing House SB RAS:
Morskoy pr. 2, 630090 Novosibirsk, Russia



Advanced Search

Journal of Mining Sciences

2016 year, number 2

Laws of Progression and Procedure for Operational Evaluation of Induced Seismicity in Mines and in Mining Areas

D. V. YAKOVLEV, S. V. TSIREL’, S. N. MULEV
Rock Mechanics and Surveying Research Institute-VNIMI, 21-ya liniya 6, Lit. A, Saint-Petersburg, 199106 Russia
Keywords: сейсмические события, землетрясения, горные работы, график повторяемости, сдвижение, сеть сейсмостанций, геодинамический мониторинг, оценки опасности, прогноз, seismic events, earthquakes, mining operations, frequency plot, subsidence, seismological network, geodynamic monitoring, hazard estimates, forecast

Abstract

The scope of the article encompasses features of natural and induced seismicity and the change in frequency plots when natural seismicity becomes natural-and-induced seismicity in mining areas and when induced seismicity becomes natural-and-induced seismicity in mines. It is shown how induced seismicity is connected with the subsidence of overlying strata in mines-seismic process propagates together with the subsidence but seismic activity lowers in the time of maximum subsidence and intensifies when subsidence ceases or decelerates. The authors lay emphasis on estimates of seismic activity in mines and give details of an integrated index F procedure tested in mines and adjusted within the 10 year-long period of application.